Working with & Customizing the Work Breakdown Structure (WBS Beta)

In Accolade Projects, the WBS Beta tab provides a clear roadmap for the project, enabling team members to visualize the interdependencies between phases and tasks. Moreover, the WBS facilitates resource allocation and scheduling, allowing project managers to assign tasks appropriately and optimize resource utilization.

This topic describes the WBS Beta tab. The original WBS tab remains available, and the WBS Beta page will eventually replace it. The original page will be removed in a future release. For the procedures that apply to that tab, refer to Working with & Customizing the Work Breakdown Structure (WBS).

The schedule outlines the project's timeline, defining the start and end dates for each phase and task.

  • Phases are collections of tasks and other sub-phases. They help organize the WBS into manageable chunks.

  • Tasks , the actionable items, are the specific activities that need to be completed within each phase.

The WBS allows for nesting phases and tasks, enabling the creation of a hierarchical structure that reflects the project's complexity.

To create the Work Breakdown Structure:

This procedure requires a PMO or Project Manager user role.

  1. Log in to Accolade Projects.
  2. To locate the project, do either of the following:
    • Search via the Quick Search Bar on the top right of the screen.

    • For a project currently being worked on, select Workspace, located on the navigation bar at the top of the page, and click on the My Projects tab.

    • If the project has not started yet, select Plan, located on the navigation bar at the top of the page, and click on Proposed Projects.

    • If the project is in-flight, select Manage, located on the navigation bar at the top of the page, and click on Projects (Brief) or Projects (Detailed).

  3. To access the project’s Online Project Editor, click on located to the left of the respective project. Click on the WBS Beta tab.

  4. To begin building the WBS, click New and select Add Task or Add Phase.

  5. Enter a name for the phase or task. A phase iconor a task icon appears in front of the name to identify the type between a phase or a task.

  6. To add a further phase or task relative to an existing item, right-click the item and select Add Phase or Add Task, then choose a placement. Before and After place the new item at the same level as the selected item, immediately above or below it. To places it one level down, inside the selected phase. Only a phase offers To.

    Note:  If the organization is integrated with Accolade, stages will also exist within the project’s WBS. Add as many phases or tasks within an existing phase or stage as needed. Stages cannot be added to phases, but multiple phases or tasks can be added within an existing stage. Refer to Integration with Accolade for more information.

    The WBS numbers of affected items update automatically.

  7. Continue creating phases and tasks in the WBS as needed.

    • To rearrange items, drag any row to its new position. Dragging a row into a phase re-parents it, and the WBS numbers of the affected items update automatically. Items managed from Accolade, and sub-projects, cannot be moved this way.

    • To duplicate an item, right-click it and select Clone Phase or Clone Task.

  8. Click Save.

    • To discard changes before saving, click Undo, or press Ctrl+Z.

Note:  Opening an item's details while edits are pending displays the Unsaved changes prompt, which offers Cancel and Save and continue. Select Save and continue to save the grid and open the item.

Additional Notes on the Work Breakdown Structure

  • To push tasks to the respective resources’ time cards, click Publish.

    • To publish the eligible tasks within a single phase, right-click the phase and select Publish Eligible Tasks.

  • To view phases and tasks that need attention, click on Items Needing Attention.

  • To view all phases and tasks within the WBS, click on All Items.

  • To switch task dependencies from Strict to Loose temporarily, click Enforce Loose Dependencies. After loose dependencies are enforced, the start and end dates for tasks can be revised based on the dependencies originally set up.

  • To export the WBS, click the download icon and select Grid to Excel, Grid to PDF, or WBS Data Report. When the Status Details column is shown, Grid to Excel lists the selected indicators that need attention for each item, or All OK when every selected indicator is in good standing.

  • The Filter by Name/ID field searches for any phase or task within the WBS.

  • To filter the WBS by item state, click the filter icon beside the Filter by Name/ID field and select the states to show. The states are Draft, Pending/Inflight, Completed/Deployed, Cancelled, On-Hold, and Not Required.

    Note:  By default, cancelled items are not listed within the WBS.

  • To order the grid by WBS sequence, click the WBS column heading. Clicking again reverses the direction. The hierarchy is preserved, so child items stay beneath their parent. No other column can be used to sort the grid.

  • To filter a column, change which columns are shown, or move a column, click the menu icon on the column heading and select one of the following:

    • Filter to filter the grid by values in that column. The operators offered depend on the column type.

    • Columns to add or remove columns.

    • Hide column to remove the selected column from the grid.

    • Move to left section to move the column into the fixed left section of the grid.

  • Right-click a saved phase or task to open its actions menu. The following actions are available:
    • To view or edit the item, select Phase Details or Task Details.
    • To set the item's planned dates, select Scheduling.
    • To add an item relative to this one, select Add Phase or Add Task, then select a placement option.
    • To copy the item, select Clone Phase or Clone Task.
    • To cancel the item, select Cancel Phase or Cancel Task.
    • To remove the item, select Delete Phase or Delete Task.
    • On a phase only, select Publish Eligible Tasks to publish the eligible tasks it contains.
    • On a task only, select Add to My Watchlist to follow the task.
    • On a published task, select Send a Message to message the assignee, or Unpublish Task to return the task to its unpublished state. Unpublish Task is available only while no time has been logged against the task.
    • The actions on offer depend on the state of the item. A phase that has not been saved offers Add Phase, Add Task, and Delete Phase. Once the grid is saved, the following options appear: Phase Details, Scheduling, Publish Eligible Tasks, Clone Phase, and Cancel Phase. Delete Phase and Delete Task are withdrawn once time has been logged against the item.
    • Note:  Selecting Delete Phase or Delete Task displays the Confirm deletion prompt, which offers Cancel and Yes, delete it. Deleting a phase also deletes everything inside it. If work has been logged against an item, the item is cancelled instead of deleted. The deletion can be undone until the grid is saved.

  • To reposition a column, drag its heading to the required position.

  • Opening an item's details displays the Details dialog, titled Details: [item name], which lists the Summary, History, Assignments, Dependencies, Fixed Cost, Comments, Attachments, Checklist, Additional Resources & Access, and Custom Attributes panels. The dialog also offers Export as PDF.

    • To open an item's details, click its name in the Name column. To rename the item in place, double-click the empty part of the cell.

    • In a task's Details dialog, the Assignments panel offers the same per-assignee dates and hours and the same Duplicate Row option as the Edit Assignments dialog.

  • To set an item's dates, right-click the item and select Scheduling. The Scheduling for [item name] dialog sets the item's Planned Start and Planned End dates, and recalculates Duration from them.

    • Select Advanced Date Mode Enabled to set how each date is derived. Forward Planning and Reverse Planning each offer System, No Earlier Than, No Later Than, and Fixed. Selecting any mode other than System displays a second field for the constraint date. Set as Key Date marks the date as a key date for the project.

    • Select Apply to return the dates to the grid, where they remain unsaved until the grid is saved. Select Cancel to discard them.

    • To change a task's assignments, click its Assignments cell. The Edit Assignments for [task name] dialog lists the project's team members. To assign a team member, select the Assign check box in that member's row.

      • Each assigned row has its own Planned Start, Planned End Date, and Planned Hours fields, which can be edited in that row. The duration recalculates from the row's dates.

      • To give a team member more than one assignment on the same task, right-click the member's row and select Duplicate Row. The new row copies the Planned Start, Planned End Date, and Planned Hours values of the original row. Either row can then be changed without affecting the other.

      • Before the assignments are saved, a duplicated row can be removed: right-click it and select Remove Duplicate Row.

      • If the assignees' Planned Hours do not add up to the task's Planned Hours, a warning appears when OK is selected. Select Save Anyway to keep the hours as entered.

      • Select OK to return the assignments to the grid, where they remain unsaved until the grid is saved. Select Cancel to discard them.